Monday, January 22, 2018

Chennai Power Shutdown Areas on 24-01-2018

Power supply will be suspended in the following areas on 24.01.2018 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

MANALI AREA: Kamaraj salai, Chinnasekkadu, Balji palayam, Parthasarathy st, Avarikolimedu, KK Thazhai.

NUNGAMBAKKAM AREA: Prakasam st, Habibullah road, Vidyodya st, Annasalai (one part), Nungambakkam High road, Kodambakkam high road, GN Chetty road, (one part), Cathedral road, Thirumoorthy nagar main st, N.H. 4th Ist lane, G.K. puram, Grama st, Wallace garden, Cathedral garden road, Lloyds road, Jaipur nagar, Haddows road, Model school road, Greams road, GA Khan st, Azizmulk st, Kamalar st, Contran smith road, Padmavathy road.

TVK NAGAR AREA: Ramamourthy colony, Ram Nagar 3rd main road (part), Vetri nagar, Mourthy st, Thiruvenadam st, Sivalingam st, Kuppusamy st, Thangavelu st, Paul Varghese st, SRP Koil north st(part).

KODUNGAIYUR AREA: MRH road, MH road, TH road, Kamarajar salai, Krishnan st, R.V.nagar, Jambuli st.

No comments:

Post a Comment