Chennai Power Shutdown On 17.04.2018: Power supply will be suspended in the following areas on 17.04.2018 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M if the works are completed.
T.G. NAGAR AREA: Part of AGS Colony, Saraswathi Nagar, Nethaji Colony, part of Andal Nagar
No comments:
Post a Comment