Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 2.00 P.M. for maintenance work. Supply will be resumed before 2.00 P.M. if the works are completed.
RAJAJI NAGAR AREA : Rajaji nagar (part), Rajamangalam, Baba nagar (part), North Jaganathan nagar, Thathan kuppam (part), Indira nagar, K K nagar Vegavathi st.
RAMAPURAM AREA : Kothari nagar, Senthamil nagar, Aneez nagar, Kandasen nagar, Annai sathya nagar, Gangai avenue, Rajiv Gandhi nagar, Mogambigai nagar, Raghavendra nagar.
ADAMBAKKAM AREA : Adambakkam (part), Ramakrishna nagar, Radha nagar and Radha nagar Extn., New Secretariat colony, part of E.B. colony.
DURAINALLUR AREA: Arani, Elavambedu, Sompattu, Puduvoyal, Panjetty, Peravallur, Kavarapettai, Chinnambedu, Durainallur.
MEDUR AREA: Medur, Pulicot, Avoorivakkam, Kollur, Arasur, Annamalaicherry.
DEVAMBEDU AREA: Devambedu, Agaram, Kallore, Poongulam, Rakkampalayam, Seganiyum.
VETRI NAGAR AREA : Vetri nagar (part), Vetri nagar Extn, Gopalapuram 3rd st, Ayyalu st, Sivalingam st, Thiyagarajan st, Varadharajan st, Govindasamy st, Chandran st, Kanniappan st.
SEMBIUM AREA : MH road, Periyar nagar (Moolakkadai), Store line, Shardlow India ltd., India Piston –II Wheel & Precision India Ltd.
Monday, February 20, 2017
Chennai Power Shutdown Areas on 22-02-2017
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment