Tuesday, December 26, 2017

Chennai Power Shutdown Areas on 28-12-2017

Power supply will be suspended in the following areas on 28.12.2017 from 09.00 am to



04.00 pm for maintenance work.
Supply will be resumed before 04.00 P.M if the works are completed.
KORATTUR AREA : CTH road, Barathidasan st, Anna st, Arunagirinathar st, Kambar st, Agasthiar
st, Nehru st, Periyar st, Chruch st, Mathiazhagan nagar, Kubera ganapathy st, Venus st,
Aasaithambai st, Flower st, Appa Durai st, Mogappair road.
AMBATTUR AREA : Jambukeswarar nagar, Kakkapallayam, 3,4,11 to 24 th , 38 to 47 th st, Central
avenue, Chavadi st, KR nagar, Janaki Raman st, Nagavalli amman koil st.

No comments:

Post a Comment