Tuesday, May 8, 2018

Chennai Power Shutdown On 09.05.2018

Chennai Power Shutdown On 09.05.2018: Power supply will be suspended in the following areas on 09.05.2018 from 09.00 am to 04.00 pm for maintenance work.





Supply will be resumed before 04.00 P.M if the works are completed.





ROYAPURAM AREA : East & West Kalmandapam road, S.N.Chetty road, Mosque Pudumanal Kuppam, New Kamaraj nagar, C.G.colony, Kasipuram A block, Singaravelar nagar, Indra nagar, GM Pettai, Jeevarathinam nagar qtrs., Periya Thambi st, Flag Staff st, Lotus Ramasamy st, AJ colony, Kasima nagar, Kasigarden, Shiek Maistry st, Hussian Maistry st, Fakir st, Part of Grace Garden, Madha Chruch road, East Madha Church st, NRT road, Railway Press, Ramar st, Mariya doss st, Thambu chetty st, Lingu chetty st, Ibrahim st, Mettu st, Adhiyapatham st, Angappanayakan st, Marakayar shahib st, Sultan st, Meerali st, Velyatham st, Kummalamman koil st, Part of TH road, Nagorar Thottam.

No comments:

Post a Comment