Chennai Power Shutdown On 05.05.2018: Power supply will be suspended in the following areas on 05.05.2018 from 09.00 am to 04.00 pm for maintenance work.
Supply will be resumed before 04.00 P.M if the works are completed.
THILLAIGANGA NAGAR AREA : Thilaiganga nagar, part of Nanganallur, Pazhavanthangal, Jeevan nagar, Sanjay Gandhi nagar, Ram nagar (Nanganallur), Adambakkam, Andal nagar, Vanuvampettai,
Brindavan nagar, Mahalakshmi nagar, Shanthi nagar, Puzhuthivakkam, part of Ullagaram, AGS colony (Velacherry west), Nilamangai nagar, Bharath nagar, Kalki nagar.
PONDESWARAM AREA : Pondeswaram entire area, Arakambakkam, Vellachery, Guruvoyal, Karlapakkam, Settupakkam, Komakkambedu, Magaral, Thamaraipakkam, Koduvalli.
No comments:
Post a Comment